Commercial

Block 7 Multi Family Towers

This new mixed-use multi-story building will provide affordable housing and retail space for downtown Redding. Frontier provided mechanical and plumbing design, including energy modeling for TCAC grant funding to exceed Title 24 requirements by 15%. The design included high-efficiency VRF systems and central heat pump water heating systems.

Floor Area: 103,000 sq. ft.
Contractor: Modern Building Inc.
Architect: Dmarc Studio and Modus Studio
Location: Redding, CA
Projected Completion: 2022

Bethel Music Downtown Office and Studio

This project converted an existing Salvation Army facility into a state-of-the-art recording studio for Bethel Music. Frontier provided mechanical and plumbing design, including in-depth acoustical measures for recording spaces.

Floor Area: 11,500 sq. ft.
Architect: RAD Studio
Location: Redding, CA
Completed: 2021

Bell Plaza Bike Depot

This project converted a historic brick building into a hub for cyclists and pedestrians as part of the downtown Redding redevelopment effort, including a café and bike depot. Frontier provided mechanical and plumbing design, including a high-efficiency VRF system and kitchen ventilation systems.

Floor Area: 3,400 sq. ft.
Architect: Trilogy
Location: Redding, CA
Projected Completion: 2022

Black Bear Diner Restaurants

Frontier has provided mechanical and plumbing design for over 50 Black Bear Diner projects across 14 states. These projects include both tenant improvement projects and shell infill projects, with new cooking lines and kitchen appliances. Frontier closely coordinated with the owner and food-service consultant to provide cost-effective and timely design services for these projects.

Floor Area: 4,000-7,000 sq. ft.
Architect: Nichols Melburg & Rossetto & Associates, Inc.
Completed: 2015 – present

Gene Lucas Community center

The Gene Lucas Community Center provides office space and community gathering spaces for the McLean Foundation. It includes a full-service commercial kitchen and senior center. Frontier provided mechanical and plumbing design, including a VRF system with economizer cooling to accommodate the requirement for zone control while minimizing equipment space requirements.
Floor Area: 22,500 sq. ft.
Architect: Greenway
Location: Fortuna, CA
Completed: 2019

Meriam Park Thrive Office Spaces

This project included the construction of a shell building for multiple tenants in a new development in Chico. Frontier provided mechanical and plumbing design, including tenant improvement projects for several of the tenant spaces.
Floor Area: 14,000 sq. ft.
Architect: Northstar Architecture
Location: Chico, CA
Completed: 2020

Redding Electric Utility Remodel

Redding Electric Utility completed this tenant improvement to relocate its headquarters to this facility. Frontier provided mechanical and plumbing design for this project and worked closely with the owner to develop an HVAC and plumbing system design that was based on the owner’s residential high-efficiency design requirements.
Floor Area: 28,000 sq. ft.
Architect: Nichols Melburg & Rossetto & Associates, Inc.
Location: Redding, CA
Completed: 2014

Additional Commercial Projects

  • Arcata City Hall HVAC Upgrades – Arcata, CA
  • Department of Health and Human Services – Eureka, CA
  • Coyote Valley Casino – Ukiah, CA
  • Weed Community Center – Weed, CA
  • Mechoopda Casino – Chico, CA
  • Shasta County Office of Education HVAC Upgrades – Redding, CA
  • Butte County Maintenance Facility – Chico, CA
  • Good News Rescue Mission House of Hope – Redding, CA
  • PG&E Powerhouse Control Station Upgrades
    • Pit 3 Powerhouse
    • Rock Creek Powerhouse
  • Shameless O’Leery’s Pub Tenant Improvements – Redding, CA
Scroll to Top